Widening and Strengthening of Khambhalia Advana Porbandar

In Road Development, we’re dedicated to crafting world-class highways and local roads that stand the test of time Road Development, we’re dedicated to crafting world-class highways and local roads that stand the test of time.

Project status

Completed

Location

Khambhalia

Project Overview

Contract Period

R&B Department, Jamnagar

Location

Khambhalia

Progress

100%

Completion Date

April 1, 2021

Project Value

₹ 27.50 Cr

Widening and Strengthening of Khambhalia Advana Porbandar Road

Widening and Strengthening of Khambhalia Advana Porbandar Road SH 28 Between Km 33/2 to 71/0

  • Executed widening and strengthening works on Khambhalia–Advana–Porbandar Road (SH-28) from Km 33/2 to Km 71/0.
  • Upgraded the existing road corridor to improve traffic capacity, connectivity, and overall transportation efficiency.
  • Carried out pavement strengthening, widening, earthwork, subgrade preparation, and associated road infrastructure works.
  • Improved pavement durability and riding quality to support safe and efficient movement of vehicular traffic.
  • Executed drainage and allied civil works to enhance road performance and long-term serviceability.
  • Managed manpower, construction materials, equipment, and site activities while maintaining required quality and safety standards.

Widening and Strengthening of Khambhalia Advana Porbandar Road SH 28 Between Km 33/2 to 71/0