- Executing riverbank protection works near the landfall point of the 20-inch Gas Export Pipeline under the KG-DWN-98/2 Project at Mulapolam.
- Constructing protective measures to safeguard the critical gas export pipeline and associated landfall infrastructure against riverbank erosion and hydraulic forces.
- Implementing erosion-control and bank stabilization works to enhance the long-term integrity and safety of the pipeline corridor.
- Carrying out civil and marine-related construction activities under challenging riverine, tidal, and site-access conditions.
- Ensuring proper alignment, grading, placement, and stabilization of protection materials in accordance with approved engineering specifications.
- Coordinating manpower, equipment, material logistics, and site activities to meet project quality, safety, and execution requirements.