Mangrol Eastern Breakwater Strengthening – Phase III

Strengthening of Existing Eastern Breakwater at Mangrol Fishery Harbour, Phase – III, Dist. – Junagadh., Gujarat

Project status

Ongoing Project

Location

Mangrol

Project Overview

Contract Period

30 Months

Location

Mangrol

Progress

82.00%

Completion Date

October 31, 2027

Project Value

₹ 289.66 Cr

Strengthening of Existing Eastern Breakwater at Mangrol Fishery Harbour

Client:   Executive Engineer, Gujarat Maritime Board
Contractual Position Sole Back-to-Back Execution Partner

  • Rehabilitated and strengthened structural armor across deep-water sections exposed to severe wave overtopping.
  • Placed 4,45,727 MT of graded core and primary armor rock stones to enhance coastal protection and structural stability.
  • Cast and positioned 1,01,593 m³ of high-performance M-30 grade concrete tetrapods, ranging from 2T to 24T units.
  • Executed heavy marine construction activities under challenging wave, tidal, and deep-water working conditions.
  • Ensured accurate placement and interlocking of large armor units to improve wave energy dissipation and prevent erosion.
  • Coordinated large-scale material handling, concrete production, transportation, and placement operations to maintain project schedules.

As of mid-2026, 82% of total structural work stands successfully completed. While the official revised deadline is October 2027, Shanti Infrastructure is on track to deliver the project fully by December 2026